Consumer Unit Replacement Cost: UK and Manchester Guide
What a new fuse board costs depends on the circuits it protects, the protection it needs and any defects found on the way, not on the retail price of the box.
Quotes are written down after a survey · no obligation
A new board is only as good as the circuits behind it, so we test them before we quote, not after.
What does a consumer unit replacement cost?
Consumer unit replacement cost with TRACEFORM is £460–£665 for a split-load board and £560–£895 for a high-integrity or full RCBO board, with no VAT added. The price covers assessing your circuits, the planned power outage, testing and the Electrical Installation Certificate. Any remedial work is explained and priced for your approval first.
TRACEFORM's consumer unit replacement cost is £460–£665 for a split-load board and £560–£895 for a high-integrity or full RCBO board. Both include assessing the circuits, a planned power outage, testing and certification. Any remedial work found on the existing wiring is explained and priced for your approval before it starts.
Worth knowing first
Key facts
Replacing a domestic consumer unit is notifiable in England. The Electrical Installation Certificate and the Building Regulations record are separate documents.
NICEIC: Consumer units and notificationNew or replacement domestic consumer units need a non-combustible enclosure. An existing plastic unit is not automatically unsafe because of how it looks.
Institution of Engineering and Technology: Consumer-unit enclosure guidanceIET lists BS 7671 Amendment 4:2026 as the current edition, with the transition from the previous version ending on 15 October 2026.
Institution of Engineering and Technology: Current BS 7671 amendment
Our published prices
TRACEFORM fuse box replacement prices
Our published prices for Manchester, Liverpool, Cambridge and Peterborough. Assessed circuits, a planned power outage, testing and certification are included.
Basis: TRACEFORM price list. No VAT is added. Remedial work on existing circuits, if any is found, is priced separately for your approval before it starts.
| Job | Price | What it covers | Source |
|---|---|---|---|
| Split-load consumer unit | £460–£665 | A new board with circuits grouped under RCDs, fitted, tested and certified. | TRACEFORM TRACEFORM price list |
| High-integrity or full RCBO board | £560–£895 | A new board where circuits have individual or high-integrity protection, fitted, tested and certified. | TRACEFORM TRACEFORM price list |
From our published price list. The price for your property is agreed before work starts.
Side by side
Why do consumer-unit quotations describe different totals?
Board design, existing-condition work and completion records are separate parts of the scope. Compare them before comparing the price.
| Scope item | Difference to check | Question for the contractor |
|---|---|---|
| RCBO or dual RCD | Different circuit-protection arrangements. | Which devices protect each circuit and why? |
| Supply only or fitted | Retail equipment excludes installation and testing. | Does the total cover a completed installation? |
| Existing defects | Remedials may be included, conditional or excluded. | What needs assessment and who approves variations? |
| EIC and notification | Electrical and Building Regulations records differ. | Who supplies each required record? |
Choose an assessed specification with explicit exclusions and approval points. A guide average cannot validate the design or diagnose retained circuits.
What should the replacement price include?
A replacement price should cover a finished, tested result: assessment of the installation, the new board and devices, fitting, circuit labelling, inspection and testing, and the completion records. Ask whether removing and disposing of the old board is included. Our prices include all of this for a typical home; the survey confirms it for yours.
Assessment, board, protective devices and circuit labelling
The contractor should identify the circuits to be connected and explain the proposed protection. Future demand, such as a charger or new appliance circuit, is worth discussing before the board is selected. It is not automatically included in replacement work. External photographs and old reports help preparation, but do not establish circuit condition or allow a reliable remote safety verdict.
EIC and Building Regulations notification
The Electrical Installation Certificate records the completed electrical installation work and associated verification. The Building Regulations compliance record relates to notification through the relevant route. An EICR instead reports condition; it is not the replacement installation certificate. NICEIC explains competent-person scheme and Building Control routes for notifiable work in England. Ask who handles notification and which records you should retain.
RCBO, dual RCD and surge protection: what changes the cost?
An RCBO combines residual-current and overcurrent protection for one circuit, so a fault switches off only that circuit. A split-load board groups several circuits under each RCD, so one fault can take out half the house. With us, a split-load board costs £460–£665 and a full RCBO board £560–£895. Ask your electrician which suits your home and why.
Surge protection and AFDD requirements must be addressed for the actual installation and the current standard. Your electrician should explain which of these devices your board needs and why. IET lists the A4:2026 edition, with the transition from the previous version ending on 15 October 2026, and new boards are designed and tested to the current edition.
When does existing wiring increase the quotation?
Earthing, bonding, damaged circuits and defects hidden behind the old board can create work beyond changing the board itself. Agree how findings will be reported and who approves extra work. The quote should separate necessary work from optional improvements. We report what we find, and anything outside the agreed price is explained and priced for your approval before it starts.
Access also affects assessment and testing. Explain locked rooms, tenants, fitted furniture and restrictions around the board. A contractor may need access to relevant parts of the installation, not just the enclosure. If a condition cannot be established before work, ask for the assumption and its variation process in writing instead of accepting an unexplained open-ended extra.
Does an old or plastic fuse box need replacing?
For metal consumer unit regulations, consult IET's enclosure guidance on new and replacement domestic equipment. It does not make every retained plastic enclosure automatically unsafe solely because it is plastic. Condition, location, protection and proposed alterations need assessment. Report damage, overheating or recurring faults and seek professional advice; do not open the board to inspect it or treat appearance as an installation test.
Can you replace the consumer unit without a rewire?
A board replacement and a rewire are separate jobs. Sound circuits can stay, while defects found during testing may need targeted repairs or a wider conversation about rewiring. Ask for the test findings and a clear list of circuits kept, repaired or replaced. Our rewire-decision guide explains how that assessment works.
How long does replacement take and will power be off?
Plan for an agreed power-off period. Assessment, fitting, testing and fixing any defects are not all done with the power off. Tell us about essential medical equipment, freezers, home working and security systems, and we agree the power-off period with you before the day.

Your worksheet
Put your own quotes through it
Runs in your browser. Nothing you type is sent to us.
What does this board quote include?
Use the contractor's written specification to record inclusions and unresolved items.
Missing-scope flags are questions for the electrician, not a compliance verdict, board recommendation or instruction to rewire. Do not open equipment to complete this record.
From enquiry to invoice
How pricing gets settled
Share the existing information
Provide the property location, old reports, known faults and future circuit plans. Use external photographs only.
Agree assessment and design
Ask for the circuit schedule, board model, protection and any identified remedials. Clarify unresolved findings.
Accept a complete quotation
Check labour, testing, records, disposal, VAT and the written variation process before agreeing work.
Plan the interruption
Explain essential loads and access restrictions. Confirm the survey-dependent isolation plan and contingencies.
Check the handover
Retain the circuit schedule, EIC and applicable Building Regulations record. Ask for an explanation of controls and any retained-circuit limitations.
Read the small print
What a quote should include, and what it often leaves out
Should be in writing
- Assessed circuit schedule and proposed board model.
- Circuit protection and relevant SPD or AFDD design.
- Installation, identification and testing.
- EIC and schedules for the completed work.
- Required notification responsibility and records.
- Disposal, variation terms and payable gross total.
Usually not included
- Rewiring unless explicitly included.
- Unidentified remedials outside the agreed scope.
- Future charger or appliance circuits unless specified.
- Decorative repair unless stated.
- A guaranteed outage or document-delivery timetable.
The receipts
Sources
Every figure on this page links back to where it was published.
- Domestic consumer-unit enclosure guidanceInstitution of Engineering and Technology · electrical.theiet.orgUndated guidance checked 1 October 2026; new/replacement requirements are not an appearance-only verdict.
- Consumer units, certificates and notificationNICEIC · niceic.comChecked 1 October 2026. Distinguishes notifiable work and available notification routes.
- Current BS 7671 amendment transitionInstitution of Engineering and Technology · electrical.theiet.orgChecked 1 October 2026; predecessor transition ends 15 October 2026. Recheck the applicable edition.
- VAT ratesGOV.UK · gov.ukChecked 1 October 2026. Standard VAT is 20% where applicable; do not infer another source's tax basis.
Questions people ask
Frequently asked questions
How much does it cost to replace a consumer unit?
Replacing a consumer unit costs £460–£665 for a split-load board or £560–£895 for a high-integrity or full RCBO board with TRACEFORM, with no VAT added. That covers assessing the circuits, the planned power outage, testing and certification. Remedial work on existing wiring, if needed, is priced for your approval first.
Can I upgrade just the consumer unit without a full rewire?
That may be possible where assessment and testing establish that retained circuits are suitable. Changing the board does not replace their cables or resolve every defect. Ask which circuits will remain, which require remedial work and why. A separate partial or full rewire decision should follow the findings, not the enclosure's appearance.
How long does a consumer unit upgrade take?
It depends on the number of circuits, access to the board and what testing finds. Tell us about essential equipment and anyone at home before booking, and we agree the power-off period with you before the day. Fitting time and time without power are not the same thing.
Do I need building regulations approval?
Consumer-unit replacement in an English home is notifiable work. A suitably registered competent-person installer can use their scheme; a Building Control route also exists. Ask which route applies and who handles it. Keep the Electrical Installation Certificate and the relevant Building Regulations compliance record together, as they document different aspects of the work.
Does a plastic consumer unit have to be replaced?
Plastic construction alone is not a remote verdict that an existing unit must be replaced. The requirements for new or replacement equipment and the assessment of retained equipment are different questions. Condition, location and protection matter. Arrange professional assessment and report concerns without opening the enclosure or attempting to inspect live parts.
Is a DIY consumer unit swap a legal way to save money?
Use a qualified electrician for the design, safe isolation, circuit assessment, connection and testing, with the appropriate notification route. This is not suitable DIY work. Do not remove the distributor's main fuse or assume the board's main switch makes incoming connections safe. An online scope checklist cannot replace competence or verification.
How do I know whether a consumer-unit quote is reasonable?
Compare another written quotation for the same board model, circuit count, device schedule, testing and records. Check remedials, exclusions, disposal, VAT and variation approval. If specifications differ, ask why before comparing totals. A market average cannot determine fairness when the existing wiring condition or the included protection and work are unknown.
No pressure
Want a written quote for your property?
Tell us about the job. We will call back to talk it through and arrange a survey if one is needed. You are under no obligation.
Secure callback request
Request a callback
Share the job and your postcode. Quotes follow a survey and are written down.
- 1 · The problem
- 2 · Your details
Written by
Ali Vahidi
Founder & Managing Director · Last updated
Technically checked by our fully qualified, NICEIC-registered electricians against BS 7671 and IET guidance. Reviewed every six months. How we write our guides
- Founder of TRACEFORM
- Accountable for this guide
- Checked by our electricians
Rated by customers on Google
Live from our Google Business Profile — shown exactly as published.
Read all 9 reviews on GoogleUpdated automatically from Google · reviews shown exactly as published
Get your fuse box replacement priced
Tell us about any tripping, old reports or plans for an EV charger or new circuits. We assess the board and circuits and send a written quote before any date is booked.
Quotes are written down after a survey · no obligation