Skip to main content
  • Manchester & Bolton emergency electricians
  • Typical response under 60 minutes
  • Qualified & insured
  • 5.0 rated by local customers
TRACEFORMEmergency Electricians
EICR & periodic inspection

EICR, electrical inspection and testing

EICR inspection and testing combines a visual review with appropriate circuit tests, then records and explains each observation.

An EICR should tell you what actually matters. We inspect thoroughly, code accurately and set out any remedial work with clear priorities and prices.

  • Condition clearly recorded
  • Testing matched to purpose
  • Under 60 minutestypical response
  • NICEIC registeredverified & trusted
  • Qualified & insuredfor your peace of mind
  • Local coverageManchester & Bolton
Request a callback
TRACEFORM electrician recording electrical inspection and test readings
Inspection with contextObservations and test results are recorded against the agreed scope.

What does an EICR inspection and electrical testing cover?

EICR inspection and testing assesses the condition of a fixed electrical installation within an agreed scope. Visual inspection and appropriate electrical testing identify observations, which are recorded and explained. The report is not an automatic repair quote; any access limits, urgent findings and separately agreed remedial work should be clear.

Key facts

An Electrical Installation Condition Report is a planned assessment of an installation's condition within an agreed scope. It is different from an emergency callout: an EICR records inspection and test findings, while fault finding investigates a specific live symptom such as tripping, heat or power loss. TRACEFORM offers inspection, testing and EICRs for residential, landlord and commercial properties. If there is smoke, sparking, overheating or loss of power now, use the relevant fault service rather than waiting for a planned report.

When to arrange an EICR

An EICR may be requested to understand an installation's condition, support property management or meet a relevant rental or organisational requirement. The appropriate timing and scope depend on the property, previous records, use and the responsible person's obligations. We do not invent a universal interval or promise a particular outcome before inspection.

What the process involves

Before the visit, agree the premises, access, occupancy, known limitations and any existing records. Inspection and testing require suitable access and periods of isolation, so occupants and business users should be told in advance. The electrician records observations and test results within the agreed scope, then explains the report and any limitations.

Planned inspection is not emergency diagnosis

A condition report samples and assesses the installation against its scope; it is not designed simply to clear an active burning smell or restore a failed circuit. Conversely, a callout that identifies and repairs one fault does not assess the condition of the whole installation. Where both needs exist, urgent risk is addressed first and a planned inspection can follow.

Homes, landlords and commercial premises

A homeowner may want a condition assessment for an established property or before planned work. Landlords and property managers should coordinate tenant notice, access and available previous reports. Commercial duty holders should identify operational constraints, distribution arrangements and authorised contacts so isolation can be planned around the premises rather than improvised on arrival.

Report findings and remedial work

The report records the findings from the completed inspection and testing. If action is recommended, the electrician can explain priorities and the evidence behind them. Remedial work is a separate scope unless explicitly agreed. A report is not a guarantee that no future fault will occur, and inaccessible or excluded areas remain subject to recorded limitations.

Diagnostic view

Schematic illustration of how this fault is traced during diagnosis.

Experiencing any of these issues?

Typical reasons an inspection is due or overdue.

A rental property due a periodic inspectionLegally required at least every five years.
No previous inspection records for the installationAn EICR establishes a documented baseline.
A purchase, refurbishment or change of useConfirms the installation suits its new use.
Signs of damage, wear or repeated nuisance trippingInspection finds the cause, not just the symptom.
Describe what you are seeing

What happens when you call

What to expect from booking to a completed report.

  1. Scope and access

    We confirm the property size, board layout and any limitations, book a time that suits tenants or trading hours, and explain how long power will be interrupted.

  2. Inspect and test

    Visual inspection of accessories, enclosures and cabling is followed by dead and live testing of every circuit against BS 7671.

  3. Code and explain

    Each observation is coded C1, C2, C3 or FI with a plain-English explanation, so you understand which items are dangerous, which need improvement and which are advisory.

  4. Remedials and certificate

    Where the report is unsatisfactory we quote the remedial work, complete it if instructed, and issue the certification showing the installation is now satisfactory.

  • 24/7 emergency availabilityWe’re here when you need us most.
  • Typical response under 60 minutesRapid response across Manchester & Bolton.
  • NICEIC RegisteredWork to the highest standards.
  • Qualified & insuredSafe, professional and fully covered.

Why choose TRACEFORM?

Inspection is only useful if it is accurate and understandable. We deliver both.

Clear observations

The report records relevant defects and classification codes without overstating findings.

Appropriate testing

Inspection and tests are completed to the accessible installation and agreed limitations.

Next steps explained

We distinguish recommended remedial work from urgent safety action.

Planned inspection and EICR

access, previous records, occupancy and the agreed inspection scope

Plan the inspection

Required isolation is planned around access, occupants and equipment before testing begins.

Agree the test scope

Property use, installation size and access limits help define an appropriate EICR scope.

Expert help for every property type

Landlords with portfolios, homebuyers, letting agents and business owners with compliance obligations.

Case studies

Inspections that found what mattered — and what happened next.

Portfolio EICRs across six Salford lets
Salford, M6 & M7 Six properties over three days

Portfolio EICRs across six Salford lets

Problem
A letting agent needed compliant reports for six tenanted flats before renewal, with minimal disruption to tenants and one point of contact.
Cause
Four properties were satisfactory. Two had C2 observations: missing RCD protection on bathroom circuits and a damaged consumer unit enclosure.
Fix
Remedial work was quoted the same day, approved by the landlord and completed within the week, followed by re-inspection of the affected circuits.

Six satisfactory reports delivered to the agent in one bundle, ahead of the renewal deadline.

Pre-purchase inspection on a Sale semi
Sale, Trafford, M33 Half-day inspection

Pre-purchase inspection on a Sale semi

Problem
Buyers wanted to know whether an attractive 1960s house needed a rewire before exchanging contracts. The survey had flagged 'older wiring'.
Cause
Testing found the original lighting circuits were unearthed and the kitchen ring had been extended with the wrong cable size — C2 items — while the rest of the installation was serviceable.
Fix
The report set out a priced schedule: earth the lighting circuits and correct the kitchen extension now, with a full rewire not required.

The buyers negotiated on price with evidence, and the remedial work was booked for the week after completion.

Greater Manchester coverage

Check your area

Enter a full UK postcode to confirm we cover your area and can respond quickly.

  • Manchester & Bolton
  • Surrounding areas

Related guides

Guides for landlords and owners arranging inspection and testing.

No obligation.Just expert advice.

Secure callback request

Request a callout

Share your details and our team will call you back, typically within 15 minutes.

Your details are only used to respond to your enquiry

Frequently Asked Questions

Direct answers about EICR requirements, codes and costs.

Does an EICR inspection fix a tripping circuit?
An EICR is a condition report, not an emergency repair appointment. If a circuit is actively tripping, book fault diagnosis; a planned EICR can be considered separately if a wider condition assessment is needed.
Will power be turned off during EICR electrical testing?
Some inspection and testing requires isolation. The duration and affected areas depend on the installation and scope, so access and business or tenant disruption should be planned beforehand.
Are repairs included in an EICR inspection?
Not automatically. The report records findings. Any remedial work should be explained, scoped and agreed separately unless your booking explicitly includes it.
What do C1, C2, C3 and FI mean after an EICR inspection?
C1 means danger present and immediate action is needed. C2 means potentially dangerous and remedial work is required. C3 means improvement recommended but not required. FI means further investigation is needed. Any C1, C2 or FI makes the report unsatisfactory.
What affects EICR inspection cost in Manchester?
Pricing depends on the number of circuits and the property type: a one-bedroom flat takes far less time than a four-bedroom house or a commercial unit. We give a fixed price up front once we know the property, and any remedial work is quoted separately and never assumed.
What follows an unsatisfactory EICR inspection?
You receive the report with each issue coded and explained, plus a quote for the remedial work. A C1 means danger is present and the item should be made safe immediately. Landlords must complete C2 and FI items, and any C1 not already made safe, within 28 days or any shorter period the report states, then provide written confirmation. Once the work is done, we issue documentation confirming the installation is satisfactory.
Does every part of an EICR inspection require isolation?
Yes, for parts of the test. Dead testing requires circuits to be isolated in turn, typically for short periods, and the whole installation is off briefly while the consumer unit is inspected. We plan this around tenants or trading hours.

Reviewed by Dan Whitaker, Senior Electrician & Technical Reviewer · Last reviewed

24/7 emergency electricians

Need a clear view of electrical condition?

Tell us the property type, reason for the inspection and any access constraints so the scope can be agreed.