Skip to main content
TRACEFORMEmergency Electricians

After an unsatisfactory EICR

What Happens After an Unsatisfactory EICR?

An unsatisfactory Electrical Installation Condition Report (EICR) means the inspection has identified a condition that requires remedial work or further investigation. It is not simply a poor score, and it does not automatically mean the property needs a complete rewire. For landlords in England, the immediate job is to understand what the electrician has found, respond according to the level of danger, arrange qualified work within the required timescale and keep the records that prove what has been done.

  • Day or nightEmergency help, day or night
  • Local responseArrival estimate confirmed when you call
  • Qualified assessmentNICEIC Registered Electricians
  • Clear pricingNo hidden costs
  • 11 min read
  • Updated 26 Oct 2026
  • Trusted by local customers
  • 5.0 rated locally
Landlord reading the C1, C2 and FI codes on an unsatisfactory EICR at a kitchen table in a bright rented flat

What happens after an unsatisfactory EICR?

What happens after an unsatisfactory EICR follows a set order for landlords in England: make any C1 danger safe at once, have a qualified person complete EICR remedial work or further investigation within 28 days of the inspection, or sooner if the report says, then give the tenant and council written confirmation within 28 days of completion.

What the regulations and guidance say

Signs the report still needs action

Open C1, C2 or FI codes, an approaching deadline or missing confirmation all need following up.

  • A report marked unsatisfactory with C1, C2 or FI observations
  • A C1 danger that has not yet been isolated or made safe
  • The 28th day after the inspection date is getting close
  • Remedial work done but no certificate or written confirmation
  • An FI observation closed without a written result
  • The tenant or council has not received the confirmation

The report at a glance

What an unsatisfactory EICR asks of a landlord

The codes, the deadline, the records and the access that turn a report into completed work.

  • Electrician fitting a red lock-off and yellow warning tag to a switched-off breaker in a consumer unitC1: danger presentAn immediate risk of injury. Make it safe straight away, often by isolating the affected circuit, before planning the repair.
  • Cracked double socket with heat discolouration on a bedroom wall beside an unplugged lampC2: potentially dangerousPotentially dangerous — urgent remedial action required, even when nothing seems to be failing day to day.
  • Electrician kneeling at an open consumer unit noting multifunction tester readings on a clipboardFI: further investigationThe inspector could not establish the safety position. Investigate without delay and record the result in writing.
  • Planner page with day 1 marked by a sticky note and day 29 circled in red beside a property fileThe 28-day deadlineRuns from the date of inspection and testing, not from when the report arrives, unless the report sets a shorter period.
  • Landlord filing an inspection report and completion certificate with envelopes ready for the tenant and councilConfirmation and recordsThe tenant and the council need the report and written confirmation within 28 days of the work being completed.
  • Letting agent pointing to a consumer unit while explaining the electrician's visit to a tenant in a flat hallwayAccess and the tenantTell the occupier what must not be used, agree access early and record every attempt if the deadline is at risk.

Not sure what your report requires?

The codes, the inspection date and the confirmation you need all have to line up.

Practical advice from our electricians

When a landlord sends us an unsatisfactory report, the first thing I ask is the inspection date, not the price. The date sets the deadline, the codes set the order of work, and the certificate at the end is what the tenant and the council actually need to see.

Ali VahidiFounder & Managing Director

The practical steps for landlords in England: understanding the result, meeting deadlines, arranging repairs and closing the paperwork.

A landlord’s electrical safety duties extend beyond a single inspection. The wider Landlord Electrical Safety and EICR Guide covers ongoing inspection and maintenance responsibilities; this article focuses on the decisions after an unsatisfactory report, from understanding the findings and arranging necessary work to securing written confirmation of completion.

There are two separate 28-day windows: one to complete the work after the inspection, and one to send the confirmation after the work is finished.

Hand highlighting a C2 observation on the code column of a printed electrical inspection report

Understanding an unsatisfactory result

An EICR records the condition of a fixed electrical installation at the time of inspection, within the stated scope and limitations. It commonly covers the consumer unit, wiring, sockets, lighting circuits and permanently connected equipment. A report becomes unsatisfactory where an observation is classified C1 or C2, and on report forms made before the 2026 amendment also FI. On the BS 7671:2018+A4:2026 model form, FI and C3 sit in the advisory section and do not, by themselves, make the report unsatisfactory. The same report may contain several observations with different levels of urgency, so the overall verdict is only the starting point.

The inspector’s observation schedule should identify the affected circuit or equipment, the classification code, any limitations and the recommended action. If the description is unclear, ask the inspecting electrician to explain what has been tested, what is unsafe or potentially unsafe, and whether anything has already been isolated. The guidance on classification codes in Electrical Safety First’s Best Practice Guide 4, listed in the official sources below, is useful context, but the action at a particular property must be based on the actual inspection findings rather than a generic list of examples.

The original unsatisfactory report is never rewritten. Keep it with the certificate or written confirmation that closes each observation.

Prioritising C1, C2, C3 and FI findings

C1 means danger is present and there is an immediate risk of injury. It requires immediate action to make the danger safe; that may involve isolating the affected part of the installation. C2 means potentially dangerous — urgent remedial action required, even where nothing appears to be failing in everyday use. FI means the inspector could not establish the safety position from the evidence available: older forms said further investigation was required without delay, the 2026 model form says it is advised, and current GOV.UK guidance for rented homes in England still expects landlords to have it investigated. C3 is advisory: improvements may be worthwhile, but C3 alone does not trigger the same statutory remedial requirement. Our guide EICR C1, C2, C3 and FI Codes Explained covers each code in detail.

Treating every observation as an emergency is unhelpful, but so is treating a C2 or FI as something to deal with at the next routine inspection. The key question is what may safely remain in use while the electrician investigates or repairs the defect. A landlord or tenant should not reopen a consumer unit, repeatedly reset protection, remove socket fronts or attempt tests. Where there is active smoke, fire, serious shock risk or another immediate threat, move people to safety and call 999 when appropriate.

An FI is not closed because someone attended. It is closed by a written result, and any new defect it finds starts its own remedial requirement.

The 28-day rule for landlords in England

Under the Electrical Safety Standards Regulations 2020, where the EICR requires further investigative or remedial work, a landlord must arrange for it to be carried out by a qualified person within 28 days, or within the shorter period stated in the report. The statutory 28 days run from the date of the inspection and testing, not from the day the PDF reaches the landlord’s inbox or the date a contractor produces a quotation. A C1 hazard needs an immediate safety response; the 28-day limit is not permission to leave an immediate danger exposed.

Government guidance now covers both the private and social rented sectors, subject to the applicable commencement and transitional arrangements. It also explains the reporting and documentation duties once work is finished. The current GOV.UK guidance for landlords and tenants, listed below, is the appropriate reference when deciding how the rules apply to a particular English tenancy. Separate housing and repairing duties may also be relevant; a satisfactory inspection five years ago would not justify ignoring a new dangerous defect today.

Arranging EICR remedial work

Confirm the observations and scope

Start with the full signed report rather than a screenshot of the summary page. Match every C1, C2 and FI observation to a circuit, location or item of equipment where the report gives that detail. Check whether the inspector made anything safe during the visit and whether there are limits on using parts of the installation. Ask for an explanation if an observation is too vague to quote sensibly. The priority is to address the reported safety issue, not to authorise unrelated upgrades simply because they were mentioned in the same visit.

Arrange a qualified electrician and agree the work

Send the report and inspection date to a suitably qualified electrician, with the property address, tenant’s contact arrangements and any access restrictions. A proper quotation for EICR remedial work should distinguish necessary repairs from optional C3 improvements and should state what further testing or access may be needed. TRACEFORM’s EICR inspection and testing service explains the difference between condition reporting, remedial work and the associated records. Where the report identifies an urgent hazard, make the safety arrangement first; do not wait for a routine appointment slot or a full refurbishment quotation.

Keep the tenant informed while access is arranged

Tell the occupier what the report means for normal use of the property, which parts of the installation must not be used and when the electrician is expected to attend. If the tenancy is managed by an agent, identify who can authorise the work and who is responsible for providing documents afterwards. TRACEFORM’s landlord electrical services information covers how landlords and agents can coordinate access and repair instructions without asking tenants to investigate unsafe electrical equipment themselves.

The records needed after the work is finished

The original unsatisfactory EICR records what was found on the inspection date. Completing the work does not rewrite that historical report into a satisfactory one. Instead, the landlord should obtain suitable written confirmation from a qualified person explaining what was investigated or repaired and whether the relevant electrical safety standards are now met, or whether further work is still necessary. Depending on the work, acceptable evidence may include an Electrical Installation Certificate (EIC), a Minor Electrical Installation Works Certificate (MEIWC), a satisfactory EICR or other appropriate certification.

For covered rented properties in England, the landlord must provide the existing tenant and the local council with the original report and written confirmation within 28 days after completion of the required investigative or remedial work. This is a separate 28-day window from the deadline to carry out the work. Keep evidence of delivery and retain the documents with the property record. A follow-up full EICR is not automatically required after every repair; the appropriate certification depends on what has actually been done, whether the inspection findings have been resolved and the qualified person’s judgement.

The paperwork should be specific. A general invoice marked “electrical repairs” may not show which EICR observations were closed, what tests were undertaken or whether the installation meets the required standard. Ask the electrician to identify the work completed and any remaining restrictions. A clear document trail helps the landlord, the tenant and any later inspector understand why the earlier unsatisfactory report should not be treated as an unresolved defect.

Further investigation and additional defects

An FI observation is not an instruction to replace equipment on speculation. It means the inspector needs more information before the condition can be assessed properly. For example, access limitations or unexpected test results may prevent a safe conclusion about a circuit. Investigation may show that no repair is needed, or it may reveal a defect that does require remedial work. Record the result of that investigation in writing rather than treating the FI as closed merely because somebody attended.

If further investigation identifies additional investigative or remedial work, the statutory steps must be repeated for that additional requirement. The first visit does not automatically close the observation. Obtain the qualified person’s findings in writing, agree the next action promptly and keep the tenant informed about any continuing safety restriction. A quotation should distinguish what is established by the original EICR from work that can only be scoped after further access or testing.

Delays, disputed findings and council involvement

The deadline should be planned around the inspection date, but complications do occur: specialist parts can be unavailable, a supply-side change may require another organisation, or tenant-specific access needs may affect the appointment. Government guidance recognises that a landlord may be able to demonstrate that all reasonable steps were taken to comply despite genuine practical constraints. That is not a general extension or a reason to leave dangerous equipment in service. Keep appointment attempts, contractor correspondence, access requests and any interim safety measures documented, and seek advice promptly if the deadline is at risk.

If a classification appears mistaken, ask the inspector for the supporting evidence or obtain a qualified second opinion without delaying action on a possible hazard. A disagreement between contractors is not itself written confirmation of compliance. Local councils have enforcement powers where duties are not met, including remedial notices, arrangements for certain urgent work and financial penalties in appropriate cases. The sensible approach is to resolve the risk and preserve a reliable record, not to debate terminology while the electrical condition remains uncertain.

Repairing the defect without unnecessary replacement

An unsatisfactory EICR may identify something localised: an unsuitable protective arrangement, a damaged accessory, inadequate earthing or bonding, or a circuit requiring more detailed testing. Some findings need targeted repair; others may justify more substantial changes. The report is evidence for an assessment, not an automatic instruction to replace the consumer unit or rewire the building. If replacement is proposed, the electrician should explain which observation it resolves and why a narrower remedy would not be suitable. TRACEFORM’s consumer unit replacement service explains the assessment behind that decision.

EICR work also differs from diagnosing a newly reported fault. A planned inspection documents installation condition; electrical fault finding investigates a symptom such as an unexpected loss of power, persistent tripping or unusual heating. If the tenant reports such a symptom before the scheduled remedial visit, it needs a fresh risk assessment. The existing guide Landlord Electrical Emergency Obligations discusses how landlord response duties continue alongside the routine inspection process.

Talk to a qualified electricianCall 07777 301818
  • 24/7 emergency response
  • NICEIC registered
  • Trusted by locals

Landlord checklist

Five steps from unsatisfactory report to closed file

Read the report, make danger safe, complete the work, get written confirmation and share it.

  1. 1Read the full reportMatch every C1, C2 and FI observation to a circuit or item, note any limitations and what was made safe on the day.
  2. 2Make danger safe firstA C1 needs an immediate safety response, which may mean isolating part of the installation before any quote.
  3. 3Complete the work within 28 daysHave a qualified person carry out EICR remedial work or further investigation within 28 days of the inspection, or sooner if stated.
  4. 4Get written confirmationObtain an EIC, minor works certificate, satisfactory EICR or other written confirmation that names what was done.
  5. 5Send it to the tenant and councilWithin 28 days of completion, give the existing tenant and the local council the report and the confirmation, and keep proof.
TRACEFORM electrician tightening a breaker terminal at a locked-off consumer unit in a rented flat hallway Two 28-day windows

Call 999 for fire or immediate danger

  • Do not ask a tenant to reopen the consumer unit or remove socket fronts
  • Do not treat a quotation or an invoice as written confirmation
  • Do not wait for the next five-year inspection to fix known defects
  • Do not close an FI just because somebody attended

Occupants should leave the property if there are flames, smoke or a developing electrical fire.

Send the full report

The observations page and the inspection date let us advise on the next step before we attend.

  • The original unsatisfactory EICR, kept unchanged
  • Certificates or written confirmation for each observation closed
  • Dates the documents were sent to the tenant and the council
  • Appointment attempts and correspondence if access was delayed
  • Any interim safety measures and restrictions on use
Safe observations onlyTenants should not touch hot, wet or damaged equipment, exposed conductors or burnt accessories.Request a callback

While the repair is arrangedFor fire, smoke, exposed live parts or an electric-shock injury, occupants should get to safety and call 999. Never ask a tenant to reopen a consumer unit, remove socket fronts, attempt tests or repeatedly reset a protective device.

Do not wait on the 28 days if you see these

For smoke, flames or fire, leave and call 999.

  • A C1 observation that has not been made safe
  • Fire, smoke, arcing or exposed live parts
  • A person has received an electric shock
  • Heat, scorching or crackling at a socket or the consumer unit
  • Water affecting sockets, lights or fixed wiring

Trust & expertise

Why landlords and agents trust TRACEFORM

Local, qualified and evidence-led.

This guide is written by our founder, checked by our electricians and draws on current GOV.UK guidance and legislation.

  • NICEIC registeredCertificated and audited
  • Qualified & insuredFully qualified electricians
  • Planned and emergency workEICRs, fault finding and remedial repairs
  • Evidence-led guidanceBased on GOV.UK, legislation and IET guidance

Written by

Ali Vahidi

Founder & Managing Director

  • Founder of TRACEFORMStarted the company in Manchester and runs it day to day.
  • Accountable for this guidePublishes it, keeps it current and answers questions about it directly.
  • Checked by our electriciansTechnical content is checked by TRACEFORM’s NICEIC-registered electricians.
Ali Vahidi, Founder & Managing Director

“An unsatisfactory EICR is a list of jobs with a deadline, not a verdict on the whole property. This guide follows those jobs in order, from making danger safe to the paperwork that closes the file.”

Last updated

26 Oct 2026

Checked by our NICEIC-registered electricians against current GOV.UK rented-sector guidance and the Electrical Safety Standards Regulations 2020.

Covering five regions with local engineers

BoltonManchesterBuryRochdaleOldhamWiganSalfordTraffordTamesideStockport

Planned inspections and emergency help

We provide planned EICRs and 24/7 emergency electrical support across Greater Manchester, Liverpool, London, Cambridge and Peterborough. Availability and any visit estimate are confirmed for your postcode.

  • Trusted locallyTrusted by local customers and highly rated on Google.
  • Five regionsGreater Manchester, Liverpool, London, Cambridge and Peterborough.
  • Clear recordsReports and remedial confirmation you can pass to tenants and councils.
  • Clear communicationInspection, repairs and costs are explained separately with no hidden costs.

FAQ

Unsatisfactory EICR questions

Answers on staying in the property, failed reports, C3 codes, deadlines, certificates and who must be told.

Can a tenant stay in a property with an unsatisfactory EICR?

An unsatisfactory report does not by itself decide whether the whole home must be vacated. The answer depends on the hazards identified, what has been safely isolated and whether essential parts of the installation can still be used. Where safety cannot be assured, do not assume normal occupation is appropriate; obtain urgent professional guidance and make suitable arrangements for the occupier.

Does an unsatisfactory EICR mean the property has failed its electrical test?

“Failed EICR” is a common shorthand, but the report’s formal conclusion is usually “unsatisfactory”. It means one or more observations, such as a C1 or C2, require remedial work, or on an older form further investigation. The individual codes and descriptions explain what has to happen next, and they matter more than the shorthand.

Is a C3 observation enough to make an EICR unsatisfactory?

No. A C3 means improvement recommended. On its own it does not make the overall assessment unsatisfactory or create the same remedial requirement as C1, C2 or FI. However, a landlord may still decide to make a sensible improvement when other electrical work is being carried out.

Does the 28-day deadline start when the landlord receives the report?

No. The statutory period for required remedial or investigative work runs from the date of inspection and testing, or a shorter deadline stated in the report. An urgent C1 hazard requires an immediate safety response regardless of that period.

Is another full EICR needed after remedial work?

Not in every case. The qualified person should supply appropriate certification or written confirmation of the completed work and its outcome. A satisfactory follow-up EICR is one possible document, but an EIC or Minor Electrical Installation Works Certificate may be appropriate depending on the work. The original unsatisfactory report should still be kept.

Who must receive confirmation after repairs?

For covered rented properties in England, the landlord must provide the existing tenant and local council with the report and written confirmation within 28 days after the required work or investigation has been completed. Keep a record of when those documents were supplied.

Can a landlord wait for the next five-year inspection?

No. The periodic inspection interval is not a waiting period for known defects. Required work must follow the report’s urgency and the legal timescale, while new dangerous symptoms reported later must be assessed when they arise.

  • NICEIC registered
  • Arrival estimate confirmed
  • Written findings

Request a secure callback

Tell us about the property, the report and the inspection date and we’ll call you back. No obligation, just helpful advice.

What do you need help with?
How urgent is it? optional
  • NICEIC
  • 24/7
  • Clear prices

Your details are only used to respond to your enquiry

  • Your details are secure and never shared
  • We’ll typically call you with an estimate confirmed when you call
  • No obligation just helpful advice

Get it resolved

Received an unsatisfactory EICR?

Send TRACEFORM the full report, inspection date, postcode and who can approve the work. Across Greater Manchester, Liverpool, London, Cambridge and Peterborough we can discuss the findings, access, further investigation and agreed repairs.

  • 24/7Emergency help, day or night
  • Qualified & insuredNICEIC Registered Electricians
  • Five regionsPlanned inspections and emergency fault help
TRACEFORM electrician handing a completion certificate in a document wallet to a tenant at a front door
Help with an unsatisfactory EICR across our five regions

Information to have ready when you call

The report and a few property details help us confirm the right visit and the timescale.

  • Your full postcodeSo we can confirm coverage and availability
  • The full EICREvery page, including the observations and limitations
  • Inspection dateThe 28 days run from this date
  • What was isolatedAnything made safe or switched off on the day
  • Tenancy and accessWhether it is occupied and who can give access
  • Who approves the workLandlord, agent or managing contact

What happens when you contact us

Clear advice on the findings, the right visit and written confirmation you can share.

  1. 1Get in touchCall or WhatsApp with the address, the current report and any deadline.
  2. 2We confirm what is neededA planned EICR, targeted fault finding or a separately agreed repair.
  3. 3Written resultsA clear report or confirmation of completed work for tenants and your file.
  • Trusted by local customers5.0 rated
  • Proudly coveringGreater Manchester, Liverpool, London, Cambridge and Peterborough

Need help now?

Help with an unsatisfactory EICR from TRACEFORM Call TRACEFORM today.

For immediate hazards, tell us what has already been isolated and whether the property is occupied so the safety position can be assessed before attendance. Emergency call-out costs are agreed before travel, and the availability and expected arrival time for your address can be confirmed when you call.

  • 24/7emergency response
  • Qualified & insuredelectricians
  • Local engineersacross Greater Manchester, Liverpool, London, Cambridge and Peterborough
  • Locally trustedlocal customers
TRACEFORM electrician handing a completion certificate in a document wallet to a tenant at a front door