Part P Building Regulations Explained for Homeowners in England
Planning a kitchen extension, a new circuit or a bathroom refit? Part P building regulations decide whether the work must be notified, who can sign it off and which certificates you should keep.
England only. Legal sources checked 14 October 2026. General guidance, not legal advice.

What are the Part P building regulations?
Part P building regulations are the electrical safety rules for homes in England, explained in Approved Document P. All domestic electrical work must meet them, but only new circuits, consumer unit replacements and alterations near a bath or shower must be notified, through a registered electrician or building control.
Key facts
In England, notification applies to three kinds of domestic electrical work: a new circuit, a replacement consumer unit, and any addition or alteration to circuits in a special location.
Building Regulations 2010, regulation 12 · UK legislationAround a bath or shower, the special location extends 0.6 metres from the bath or tray edge and up to 2.25 metres above the floor, or higher if the shower head is mounted higher.
Building Regulations 2010, regulation 12 · UK legislationA self-certifying installer must give the occupier a copy of the compliance certificate, and notify building control, no more than 30 days after the work is completed.
Building Regulations 2010, regulation 20 · UK legislationA registered electrician should hand over an Electrical Installation Certificate or Minor Works Certificate, plus a Building Regulations Compliance Certificate for notifiable work.
Electrical Safety First Part P guidance · Electrical Safety FirstA regularisation certificate for unauthorised work is evidence, but not conclusive evidence, that the relevant requirements have been met.
Building Regulations 2010, regulation 18 · UK legislation
The detail
Part P is the electrical safety part of the Building Regulations for dwellings in England. Every electrical job in a home must meet it, but only some jobs have to be notified. This guide explains the difference, the two ways notification happens and the documents that prove the work was done properly.
What Part P actually requires
Part P of Schedule 1 to the Building Regulations 2010 sets one performance requirement for electrical installations in dwellings: they must be designed and installed so that people are reasonably protected from fire and electric shock. Electrical work first came under the Building Regulations on 1 January 2005. The government's Approved Document P, currently the 2013 edition, explains how to meet the requirement and when work has to be notified.
Two ideas are easy to mix up. Compliance applies to all electrical installation work in a home, garden, outbuilding or conservatory, whatever its size. Notification applies only to certain jobs. A replacement light switch does not need to be notified, but it still has to be installed safely and to the national wiring standard, BS 7671.
Which electrical work is notifiable in England?
Regulation 12 of the Building Regulations 2010 lists three kinds of notifiable electrical work in England: installing a new circuit, replacing a consumer unit, and adding to or altering an existing circuit in a special location. A new circuit covers jobs such as a dedicated supply for an electric shower, a cooker, an EV charger, a garden office or the sockets in a kitchen extension.
A special location is the zone around a bath or shower, and the whole of any room containing a swimming pool or sauna heater. In a bathroom, the zone runs 0.6 metres out from the edge of the bath or shower tray and up to 2.25 metres above the finished floor, or to the height of the shower head if that is higher. Where there is no tray, it extends 1.2 metres from the centre of the shower head.
Work that is not normally notifiable
Adding a socket or light to an existing circuit outside a special location is not notifiable in England, and nor are like-for-like replacements of accessories, light fittings or a damaged length of cable. Kitchens and gardens stopped being treated as special cases in England in April 2013. None of this removes the duty to work safely and test properly: a competent electrician should still issue a Minor Works Certificate for an addition or alteration.
Route one: a registered competent person
Most notifiable work is handled by an electrician registered with a government-authorised competent person scheme, such as NICEIC or NAPIT. The registered business carries out and tests the work, then notifies its scheme, which records it with building control. You do not need to contact the council or pay a building control fee.
Under regulation 20, you should receive a Building Regulations Compliance Certificate no more than 30 days after completion. It is separate from the electrician's own test certificate. If it does not arrive, contact the installer first and then the scheme they are registered with. You can check an electrician's registration on the Registered Competent Person Electrical register before you agree a quote.
Route two: building control
If the person doing notifiable work is not registered with a scheme, a building notice or full plans application must be made to a building control body before work starts, and a fee is payable. Building control will then want evidence that the installation was inspected and tested by someone competent, and issues a completion certificate when satisfied.
This route can suit a wider building project already under building control, but it adds an extra party and cost to an electrical job. For a stand-alone new circuit or consumer unit, a registered electrician is usually simpler because the notification is part of their service.
Electrical Installation Certificate or Minor Works Certificate?
These certificates record the electrician's design, installation and test results against BS 7671. An Electrical Installation Certificate, or EIC, is used for a new installation, a new circuit or a consumer unit change, and includes a schedule of test results for each circuit. A Minor Works Certificate covers smaller additions or alterations that do not create a new circuit, such as an extra socket on an existing ring.
Neither one is the same as a Building Regulations Compliance Certificate, which confirms notification. For a notifiable job you should end up with both kinds of document. An Electrical Installation Condition Report, or EICR, is different again: it reports on the condition of an existing installation rather than certifying new work. BS 7671 Amendment 4 was published in April 2026, so ask which edition your certificate is issued against.
What happens if notifiable work was never notified?
Without notification, the local authority has no record that the work complies. That gap often surfaces when you sell, because conveyancing forms ask about electrical work and the matching certificates. Government guidance warns that failing to comply can lead to prosecution and unlimited fines, and a local authority can require non-compliant work to be altered or removed.
The usual way to put things right is regularisation under regulation 18. The owner applies to the local authority, which may ask for parts of the installation to be opened up or tested. Building control commonly asks for an inspection and test report from a qualified electrician as evidence. If satisfied, the authority issues a regularisation certificate. If you are selling, speak to your solicitor before approaching the council, because some conveyancing options depend on the order of steps.
Can I do my own electrical work under Part P?
The regulations apply to the work, not just to electricians, so a homeowner doing notifiable work must notify building control before starting and pay the fee. You also need the knowledge and test equipment to prove the installation is safe, which most people do not have. TRACEFORM's advice is simple: leave fixed wiring, consumer units and bathroom circuits to a registered electrician. Safe homeowner actions are limited to things like switching a circuit breaker off.
This guide covers England only
Wales has its own version of the Building Regulations with a different list of notifiable work, and Scotland and Northern Ireland use separate systems. If your property is outside England, check the rules for that nation before relying on the routes described here.

Is your planned job notifiable under Part P?
Common homeowner projects in England, with the notification position and the paperwork you should expect at handover.
| Planned job | Notifiable in England? | Paperwork to expect |
|---|---|---|
| New circuit for an extension, shower, cooker or EV charger | Yes, every new circuit | Electrical Installation Certificate and Building Regulations Compliance Certificate |
| Replacing a fuse box or consumer unit | Yes | Electrical Installation Certificate and Building Regulations Compliance Certificate |
| Adding or moving a socket or light within a bathroom zone | Yes, special location | Minor Works Certificate or EIC, plus compliance certificate |
| Extra socket or light on an existing circuit in a kitchen, bedroom or garden | No | Minor Works Certificate from the electrician |
| Like-for-like swap of a switch, socket or light fitting | No | Ask the electrician to record and test the work |
Verdict. If a job adds a circuit, changes the consumer unit or touches a bathroom zone, plan for notification from the start.
Sources: Building Regulations 2010, regulation 12 (UK legislation) · GOV.UK building work, replacements and repairs (GOV.UK)
Step by step
Describe the whole project
Tell the electrician about every new appliance, room and outdoor supply you plan, so new circuits and bathroom-zone work are identified at quote stage.
Check the registration
Look the business up on the Registered Competent Person Electrical register and note which scheme it belongs to.
Agree the paperwork in writing
The quote should state who notifies the work and which certificates you will receive, including the compliance certificate.
Collect the test certificate at handover
Ask for the EIC or Minor Works Certificate when the work is finished and the test results have been explained to you.
Watch for the compliance certificate
It should arrive within 30 days of completion. If not, contact the installer, then the scheme operator.
File everything together
Keep certificates, quotes and invoices in one place. You will need them when you sell or when the installation is next inspected.
Checklists to keep
Checks to run
- Quote names who notifies the work
- EIC or Minor Works Certificate received and explained
- Building Regulations Compliance Certificate received within 30 days
- Documents stored with the property deeds or sale file
Before you install or change anything
- List of new circuits, appliances and outdoor supplies planned
- Bathroom or shower work marked on a simple floor plan
- Any earlier certificates or condition reports found
- Electrician's registration checked on the competent person register
Frequently asked questions
Does Part P apply to every electrical job in a house?
Yes. All electrical installation work in a dwelling in England must meet the Part P safety requirement, including small jobs. What varies is notification: only new circuits, consumer unit replacements and work in special locations such as bathroom zones have to be notified to building control.
Is a new kitchen extension circuit notifiable?
Yes, if the extension is fed by one or more new circuits, which is usual. Adding a socket to an existing kitchen circuit is not notifiable in England, but new circuits are wherever they are. A registered electrician can notify the work for you.
What is a Building Regulations Compliance Certificate?
It is the document confirming that notifiable electrical work was registered with building control through a competent person scheme. It is usually issued by the scheme on behalf of the registered electrician, and you should receive it within 30 days of completion.
Who signs off electrical work if my electrician is not registered?
For notifiable work, building control must be told before work starts through a building notice or full plans application, with a fee. Building control then checks the work and issues a completion certificate. It cannot be signed off retrospectively by a different registered electrician.
Can I fix work that was never notified under Part P?
Usually through regularisation. The owner applies to the local authority, which may ask for an inspection and test report or for parts of the work to be opened up. If you are selling, ask your solicitor before contacting the council, as the order of steps can matter.
Are Part P rules the same in Wales?
No. Wales has its own Building Regulations and a wider list of notifiable electrical work. This guide covers England only, so Welsh homeowners should check the Welsh Government's guidance or ask a registered electrician working in Wales.
Is a fee charged when a registered electrician notifies the work?
You do not pay a building control fee on this route. The electrician's scheme registers the job, and any notification cost is part of the electrician's price. Ask for it to be shown clearly in the quote.
Sources and references
- Approved Document P: electrical safety in dwellings GOV.UKStatutory guidance for England, 2013 edition. Checked 14 October 2026.
- Building Regulations 2010, regulation 12 UK legislationParagraph (6A) and the special location definition, England version. Checked 14 October 2026.
- Building Regulations 2010, regulation 20 UK legislationSelf-certification: certificate and notice within 30 days of completion. Checked 14 October 2026.
- Building Regulations 2010, regulation 18 UK legislationUnauthorised building work and regularisation certificates. Checked 14 October 2026.
- Electrical Safety First Part P guidance Electrical Safety FirstNotification routes and the certificates a registered electrician provides. Checked 14 October 2026.
- GOV.UK building work, replacements and repairs GOV.UKEngland householder guidance on notification, schemes, penalties and records for sale. Checked 14 October 2026.
- Registered Competent Person Electrical register Electrical Competent Person Scheme OperatorsSearch tool to check whether an electrician is registered in England and Wales. Checked 14 October 2026.
- IET current BS 7671 editions Institution of Engineering and TechnologyAmendment 4 published April 2026; check the edition stated on your certificate. Checked 14 October 2026.
Talk it through with an electrician
Share your postcode and what you are planning. We call back to discuss the installation side; we do not give legal advice.
Secure callback request
Request a callback
Written by Ali Vahidi
Founder & Managing Director · Last updated
General guidance for England, not legal advice. Legislation and guidance checked 14 October 2026; recheck before relying on it for a project or sale.
- Founder of TRACEFORM
- Accountable for this guide
- Checked by our electricians
Rated by customers on Google
Live from our Google Business Profile — shown exactly as published.
Read all 7 reviews on GoogleUpdated automatically from Google · reviews shown exactly as published
Plan the paperwork with the work
Request a callback to talk through a new circuit, consumer unit or bathroom job. Our NICEIC-registered engineers notify notifiable work and explain every certificate at handover.